Close view of a white oak drawer front with a brass pull under a limestone counter edge

We remodel Austin kitchens, baths and whole homes.

Designed and built by one team, in white oak, limestone and plaster.

4.9127 homeowner reviews

A remodeled ranch house: plaster walls, a white oak floor and dining table, the oak kitchen beyond and steel doors open to a live oak
Close view of the honed Lueders limestone used for the counters

Projects like yours1 of 3

Kitchen, Travis Heights

New layout, oak cabinets, limestone counters

Price band
$140k to $165k
On site
12 weeks
See this kitchen
The Travis Heights kitchen: white oak cabinets, limestone counters and a plaster range hood
Close view of deep blue handmade tile meeting the edge of a plaster arch, with a brass valve

Projects like yours2 of 3

Primary bath, Tarrytown

Curbless shower in blue handmade tile, plaster niche, oak vanity

Price band
$65k to $80k
On site
7 weeks
See this bath
The Tarrytown bath: a curbless shower in deep blue handmade tile, a plaster niche, a round mirror and a white oak vanity
Close view of a white oak handrail on a brass bracket against a plaster wall

Projects like yours3 of 3

Whole home, Barton Hills

A 1958 ranch, taken to the frame and rebuilt

Price band
$420k to $480k
On site
30 weeks
See this house
The Barton Hills house at dusk: white brick, a metal roof and steel doors open to a limestone patio

What we do

Six kinds of work, one team for all of it.

Design, permits, construction and finish carpentry are all in house, so one company answers for the whole job.

A carpenter checks a white oak cabinet door with a square and a pencil

Why Ashgrove

Four things you can hold us to.

They are written into the contract, not only onto this page.

  1. One team, start to finish

    The people who design your project are the people who build it. There is no handoff between an architect and a contractor, and nobody else to point at.

  2. A fixed price before we start

    You get the full price and a line by line scope before any work begins. It changes only if you change the plan.

  3. One project lead, on site daily

    One named person runs your job, is at your house every working day, and answers your messages the same day.

  4. A five year warranty

    We come back at eleven months for a full walk through, and for five years we fix anything we built that fails.

See how a project goes

Our record

640

homes remodeled in Austin and the towns around it since 2007, by a crew of 34 on our own payroll.

Finished on the contract date
94%
Change orders we asked for
0
Of our work comes from past clients
41%
The Ashgrove cabinet shop: finished white oak cabinets on rolling carts, sheets of oak plywood on a rack, and the crew at the cutting table and the edge bander
Our shop in East Austin. Every cabinet we install is built here, by the people who will fit it in your house.

Recognition

Judged by other builders and designers, on finished houses.

  1. Regional remodeling awardKitchen, Travis Heights
  2. Regional remodeling awardWhole home, Barton Hills
  3. Residential design awardBath, Tarrytown
  4. State remodeler of the yearFinalist

Reviews

4.9

From 127 homeowner reviews.
The newest is three weeks old.

  1. They gave us one price in March and that was the price in August. The only change was the one we asked for.

    Maya, Travis HeightsKitchen, October 2026

    Reply from Ashgrove

    Thank you, Maya. Enjoy the kitchen, and we will see you at the eleven month walk through.

  2. Luis was at our house every morning by 7:30 and sent a photo update every afternoon. We never had to chase anyone.

    Daniel's finished bath: a shower in deep blue handmade tile, a plaster niche and an oak vanity

    Daniel, TarrytownPrimary bath, September 2026

  3. We lived in the back half of the house for five months. They sealed it off, kept it clean and finished two days early.

    Elena, Barton HillsWhole home, August 2026

    Reply from Ashgrove

    Elena, living through a whole home remodel is hard, and you made it easy for the crew. Thank you.

  4. When they opened the wall they found old wiring nobody expected. They showed us photos the same day, explained the options and the cost, and let us decide.

    Robert, ZilkerAddition, July 2026

What it costs

Build your budget.

Make the few choices that move a kitchen’s price most, and watch the plan and the price range change. It takes about a minute.

14 ft11 ft
Room
157 sq ft
Estimate, a range
$75k to $88k
On site
6 to 8 weeks

The basics $37k

Demolition, wiring, paint, permits and our crew.

Shape 17 ft of cabinets

Island No extra cost

Layout No extra cost

Cabinets +$22k

Counters +$6k

Appliances +$14k

Floor +$3k

When the house was built No allowance

1 of 9
Send this plan to Ashgrove

How it goes

Four steps, and a date for each.

You get the calendar before we start, and you always know what the next payment is for.

Keep scrolling to follow a job.

Step 1 of 4About an hour

Visit

We walk the house with you, measure, and listen. You get a first price range within three days.

You pay Nothing. The visit and the first range are free.

A tape measure held against an old kitchen cabinet, beside a notebook with a sketch of the room

Step 2 of 44 to 8 weeks

Design and fixed price

Drawings, materials and a line by line price. You sign for the build only when the number is fixed.

You pay 5% when design starts.

Kitchen drawings on a table with samples of white oak, limestone, plaster and a brass pull

Step 3 of 46 to 18 weeks

Build

One project lead on site every working day, and a photo update every afternoon.

Before the drywall goes up, we photograph every open wall: each pipe, each wire. You get the full set at handover, so you always know what is behind your walls.

You pay 90% in three parts: 30% at the start, 35% when the cabinets are in, 25% when the work is done.

An open stud wall during a remodel with new water lines and wiring run straight and clipped

Step 4 of 4One day

Handover

We walk through it together, you get the full set of wall photos, and we come back at eleven months.

You pay The last 5%, after your walk through.

A photo book of the open walls and a set of keys on the counter of a finished kitchen

Where we work

Austin, and the towns around it.

Most of our work is inside the city. We also build in the towns around it, out to about 25 miles.

5 miles10 miles20 milesNTravis HeightsBouldin CreekZilkerBarton HillsClarksvilleTarrytownHyde ParkRosedaleAllandaleNorthwest HillsWest Lake HillsRound RockCedar ParkPflugervilleLakewayBee CaveDripping SpringsBuda
See home remodeling in Round Rock

Questions

What people ask us first.

Short answers. If yours is not here, call or write and you will have a reply the same business day.

Talk to a person

(512) 555-0142

Monday to Friday, 8 am to 5 pm

Book a consultation

What does a kitchen remodel cost?

Most of our kitchens cost between $75,000 and $165,000. Keeping the layout sits at the low end. Moving walls or plumbing, custom cabinets and stone slabs move it up. The budget builder on this page gives you a range for your own kitchen in about a minute.

How long does it take?

Design and pricing take 4 to 8 weeks. Building takes 6 to 18 weeks on site: about 6 to 8 weeks for a kitchen that keeps its layout, longer when walls move or the whole house is involved. You get the calendar before we start.

Can we live in the house during the work?

Usually yes, for a kitchen or a bath. We seal off the work area, set up a temporary kitchen and clean up every day. For a whole home taken back to the frame, plan to move out while we build.

Do you handle the permits?

Yes. We draw the plans, file for the permits with the city and meet the inspectors. The cost of permits is part of your fixed price.

Who is in my house every day?

One project lead runs your job and is on site every working day. The carpenters are our own employees. Plumbing and electrical work is done by licensed trades we have worked with for years.

What if you find something behind the wall?

We stop, photograph it and show you the same day, with the options and the cost of each. In houses built before 1970 we put an allowance for this in the price up front. If we do not need it, you do not pay it.

Book a consultation

Tell us about your house.

It takes about a minute, and the first visit is free.

I am planning at zip code .

My budget is and I would like to start .

I am . Reach me at or .

We reply the same business day, call you that week, and visit the house within two weeks. The visit is free.

We call only to answer this request, and never sell or share your details. Rather talk now? Call (512) 555-0142, Monday to Friday, 8 am to 5 pm.

A white oak front door standing open in a plaster wall, with a limestone step and warm light inside